Live 8-Block Mixed Datacenter: Click Any Block to Upgrade Speed!
See how a pre-built Day-1 40G Clos spine bottlenecks newer 100G/200G blocks, while Direct-Connect OCS + ToE unlocks their bandwidth.
Interactive Cost & Power Model (§6.5, Fig. 14)
Toggle Jupiter’s architectural pillars live against the conventional Clos + Patch Panel baseline.
Slide Plot: Act 1 (Click to Zoom Full-Screen)
LIVE SciPy MILP Solver: Heterogeneous ToE “Demultiplexer” (§4.5, Fig. 9)
Drag traffic demands below — the Python backend re-solves the joint integer link-allocation + routing MILP live!
Multi-Fabric Sweep (§6.2, Fig. 12)
Throughput normalized to a perfect high-speed spine (1.0) & optimal stretch across 6 heterogeneous speed mixes.
| Fabric Mix | Unif TP | ToE TP | Unif Str | ToE Str |
|---|
Slide Plot: Act 2 (Click to Zoom Full-Screen)
LIVE LP: Variable Hedging Burst Test (§4.4, Fig. 8)
Constraint: x_p ≤ D · C_p / (B · S) · Pred: A↔B=2, A↔C=2
2-VRF Loop-Free 1-Hop Transit (§4.3)
Why single-table destination routing loops when A→B→C and B→A→C coexist.
LIVE Fig. 13 Time-Series: Watch Your Spread S Track 30s Traffic!
Switch between Bursty Fabric D vs. Stable Fabric G (§6.3) and drag Spread S on the left to re-simulate live.
Slide Plot: Act 3 (Click to Zoom Full-Screen)
LIVE Rewiring Player: Adding Blocks C & D (§5, Fig. 11 & Fig. 18)
Step through failure-domain increments — compare Single-Shot outage (33.3%) vs. Hitless Drain (≥83.3% online).
LIVE 4-Failure-Domain OCS Kill Switch (§3.2, §4.2, Fig. 6)
Click any OCS failure domain to simulate a power/control outage — real SciPy LP re-evaluates residual throughput live!
Slide Plot: Act 4 (Click to Zoom Full-Screen)
All 4 Generated Paper Plots (Click Any Chart to Full-Screen Zoom)
Every figure below was freshly generated by your Python solvers in outputs/.
12-Minute Stage Cue Card & Q&A Crib Sheet
Keys: 1–5 switch tabs · T toggle projector light theme
0:00–3:00 · Act 1: The Clos Trap & Optical Hardware
Click blocks on Tab 1 to upgrade them to 200G — watch Clos flatline at 20T (derated!) while OCS unlocks full speed. Mention Palomar 136×136 MEMS (850nm camera servo), 0W passive circulators (halve OCS ports, bidirectional constraint), CWDM4 interop, and −30% capex / −41% power.
3:00–6:00 · Act 2: Topology Engineering Demultiplexer
On Tab 2, drag A↔B or A↔C sliders live and watch SciPy MILP re-discover Google’s 300/200 split with 5T transiting via B (turning B into a 200G→100G demux!). Note cadence: ToE runs every few weeks today, but large ML jobs will push it faster.
6:00–9:30 · Act 3: Variable Hedging & 2-VRF Routing
On Tab 3, trigger the A↔B=4 burst at S=0.05 (MLU=1.00!) then slide S up to watch MLU drop to 0.75. Flip Fabric D (bursty, loves high S) vs. Fabric G (stable, loves low S), and toggle 2-VRF isolation to show loop-free 1-hop transit.
9:30–13:00 · Act 4 [Tier 2]: 4 Failure Domains & Zero-Loss Rewiring
Press ▶ Play on Tab 4 to step through Fig. 11 (≥83.3% online vs. Single-Shot 33.3% crash). Click “Kill Domain 1” to prove ≥75% residual throughput live, and click “Disconnect Orion” to demonstrate fail-static OCS mirrors + generated OpenFlow rules!
Rapid-Fire Q&A Cheat Answers
Why does Direct-Connect match Clos throughput? Gravity Model (RMSE 0.05) + Theorem 2 + NPOL skew (<10% quiet transit blocks).
What happens on OCS power loss? Drops links (unlike fail-static control loss), bounded to 1/32 per rack & ≤25% per power/control domain.
New bottleneck after 9.6× OCS speedup? Operations workflow software jumped from 4.7% → 37.7% of critical path (Table 2).